Tracking

Daisypath Anniversary tickers

Saturday, May 14, 2011

Wrkdy 41 (d47) Metal foil up

Rain: seems likely in the evening, thundering now
Visit: 1
10.30am
1. Went after brunch, lucky to be there at that time when IWK lorry came and the IWK person-in-charged called me to ensure that I am there and asked me to remove the roof lorry parked in the back lane. Saw the desludging in action.
2. The front facing roof has been fully covered with metal deck and they are putting the double sided metal foil up for the front facing roof.
3. Then they started putting up the metal deck for the back portion.
4. Door frame for MBR is in.
5. Putting up the last part of bricks on top of wall divider to 18.
6. Back door way has been cut to bigger size all the way down except for the last brick.
7. Chat to a Mrs L tenant of the row rental costs RM650. Said some bought 260 and do only a little. Said one changed only roof for 20. Said one wanting to sell for 300. Has daughter and son and grandchildren.
8. Y called to tell about courtyard don't over cover with metal deck.

No comments:

Post a Comment