Tuesday, May 24, 2011

Wdy 49 (d57) Water proof rc porch

Rain: 3pm-3.30pm
Visit: 1
8am
1. Noticed that:
- the 18 divider wall has been extended all the way to the front of the rc porch, not plastered yet
- many bags of cement on site
2. Called C to arrange to meet on site (seems like he is too busy to visit today)
3. Update the plumber on the wet area tap change of position and tap of wet kitchen (150mm+..)
4. Water proofing will be done on front rc porch today
5. At the back rc side will 16 have been extended and plastered nicely after it was brought up yesterday