Rain: Drizzling 8am to 10am
Visit: 1
8am
1. Main purpose is to talk to C about:
- the existing wall is protruding out of the new door frame
-- his solution is to scrap off all the existing plaster on those walls with door frames.
2. Middle sdoor is too low claimed K but C said to do a slopping floor leading to it. (we thought of making a step down in the corridor before it)
3. Work will be done to cast the supporting walls around the sdoors.
4. K asked about the naco windows which C answered.
Work started for 2 months already. 2 more months to go!
No comments:
Post a Comment