Tracking

Daisypath Anniversary tickers

Tuesday, May 17, 2011

Wdy 43 (d50) Brick mbr top

Rain: afternoon/evening
Visit: 1
8.15am
1. Called C to wait for us (he was at site at the time of the call). All working on a public holiday.
2. Workers are furiously bricking up the top parts of the courtyard and also the MBR.
3. Saw some pipes for sewerage in the back ten.
4. Climbed up the back ten rc roof and took some photos of the roof from the back.
5. Ledges all around for the back window have been casted with wood frames support still in place.

No comments:

Post a Comment