Friday, May 20, 2011

Wdy 46 (d53) Plaster storeroom

Rain: Short heavy downpour ~2pm to 2.20pm Drizzling 3-4pm
Visit: 1
~4pm
1. Storeroom has been plastered
2. The previous window of the previous living room has been bricked up
3. The ventilation blocks above the previous main door have all been removed
4. Outlet pipe has been embedded into the dry kitchen wall
5. Outlet pipe has been put into the courtyard ground
6. 3 pipes going into the 1st tank now
7. 2 through holes with pipes wall have been created in the back wet cubicles wall