Rain: no rain hot day
Visit: 3
8.05am
1. Just missed C, saw him on way there, round the bend.
2. Was told:
- need keys
- skylight will be done today
9.45am
1. Use keys
2. Electricians putting up a temporary stand for the main e-meter
3. E confirm no do ac
4. confirm time for skylight
5. was told that the back window frame is in.
1pm to 2.45pm
1. Specify skylight spots.
2. See them done.
Plastering works continue. 2c, 4i (additional 2). View wire mesh, 7502 (thinker) or 7503 type.
No comments:
Post a Comment