Rain: nil
Visit: 1
8am
1. Party wall back ten with 16 has been completed with topping up their party wall too.
2. Window of room 2 facing back ten has been bricked up neatly.
3. Party wall room 2 with 16 has been done until roof beam.
4. Party wall dry kitchen with 18 in progress.
5. Removing wood support from roof beam.
6. The bricks are laid very neatly.
7. Selected off white for metal deck.
8. Informed C that the cubicles for wc and shower should be just openings with no lintel across the openings.