Rain: ~6.30pm to 8pm
Visit: 1
11.30am
1. Both electricians were there drilling holes for the electricity wires.
2. All wet works workers were on the roof stacking up the roof tiles.
3. Saw them leaving for lunch at 12pm.
4. G noticed those battens that have been cut and welded look like going rusty so he called and requested C to ensure that these are painted over again.
5. Went to KM to look at tiles and taps.
No comments:
Post a Comment