Rain: nil (7 days without a single drop of rain)
Visit: 1
8.10am
1. Did not meet C
2. Bricks for party wall 16 high up.
3. Brick up previous window of wc.
4. Install door frame for store room.
5. Went in to have a look and feel. Wash area felt small. Common area is spacious.
6. Need to change folding doors to open indoor and cover the whole opening framed by concrete pillars.
7. Called secdoor to postpone 16 date delivery because we think it is better to have the roof up before putting in the secdoors.
No comments:
Post a Comment