Rain: light long rain ~ 5pm-8pm
Visit: 1
9.50am
1. Supposed to be a quick see shoot but turned to be a long chatty conversation with one of the two roof installers.
2. Saw the plumber come in.
3. Start to lay bricks top party wall 18.
4. Lined the wash area door way with perforated 90 degree line strips.
5. One mroof installer joining up 3 feet to the existing 20 feet mild steel.
No comments:
Post a Comment