Rain: nil
Visit: 1
7.25am
1. Went for breakfast at 6.30am and were the first ones to reach the site, just in time to see AK and a thin young iman came in.
2. C then came and we chose the colour of satin leather rather then grey
3. The dividing wall of the storeroom and wet kitchen is up with the metal door frame in place.
4. The new door way of the 2nd room has been created by knocking a hole in the wall but the old doorway has not been bricked up yet.
5. The ventilation bricks on top of the existing door way of the new 2nd room have been removed but not bricked up yet.
6. Still putting up the top of the separator wall of 18.
7. Started putting up the bare brick walls of the living room.
8. Called IWK to come and do desludging.
9. Digging toilet pathways.
No comments: