Rain: nil
Visit: 1
8am
1. Most party wall done until roof beam
2. Informed AK that the cubicles for wc and shower should be just openings with no lintel across the openings
3. Should be doing wash area bricks today
4. 3 aluminium door frames are there (maybe delivered yesterday)
5. Took aerial photo
No comments:
Post a Comment