Tracking

Daisypath Anniversary tickers

Saturday, May 28, 2011

Wdy 53 (d61) Concrete door lintel

Rain: ? afternoon shower?
Visit: 1
7.45am
1. Was told that
- the two louvre window frames have been put in.
- concrete has been casted around the sdoor frames.
- complete putting in the bricks around the front sdoor and back door

2. Waited until 8.45am but still no sign of C so we left. Saw a man walking around as exercise.

No comments:

Post a Comment