Saturday, June 25, 2011

Wdy 77 (d89) Parking stopper

Rain: nil
Visit: 2 (Didnot see C today).

1. 8.30am
- Mini courtyard grill done (but missing the middle long bar so got to add it).
- Plastering the top cement bar of the red brick fence nicely.
- Measuring the level of the next 1.x? feet ground.
- Tinman mixing cement


2. 4.55pm
- AK and plumber leaving
- no red flowers/wheels, only 3 blue sticks
- 3 door frames painted black
- Parking bar stopper done
- cement layed for the next 1.x? feet before stopper
- sand readied for pavers
- wiring to gate done
- the slanting big small folding glass door footing rectified
- saw a man cutting off some parts of the mango tree