Rain: nil
Visit: 1
8am
1. Two sides red brick walls done with one brick near 18 wall orangey in colour so it was taken out and a redder brick put in.
2. The two pipe holes look like eyes according to someone so had to be taken out and just leave a brick gap.
3. All brick gate pillars are gone.
4. Skip 23 replaced with skip 6.
5. Courtyard floor being done.
6. Plumber came with C and was given the specifications of moving the wm.
7. Saw one tiler coming in to do the wet room tiles.
8. Text A to meet up this week onsite but no reply yet.