Rain: nil
Visit: 2
8am
1. The bottom side garden wall near to 18 has been fully plastered.
2. Down pipe has been put on the side near to 18.
3. 2 drainage pipes near 18 have been put into the ground all the way to the drain.
4. Wall tiles in 2 cubicles done half way (no more tiles - not enough)
5. Wc floor seems too low until the ventilation pipe is exposed horizontally but C says it can and will be fixed by making the floor high enough to cover the exposed pipe and then slant towards the outlet pipe - no issue at all.
6. Courtyard floor too low until the outlet pipe joint bend is exposed, pointed out to C who says it is ok can be covered by the concrete floor.
7. Decide on how the pipes leading to the wm is to be done - above ground.
8. To have a barrier or planter box protect the pipe.
9. Drain hole near 18 instead of in the middle.
10. Working on floor of wet kitchen.
11. Saw the ss frames for the 3 septic tanks.
12. A called around 4pm to say ok to meet tomorrow around 2-3pm or earlier - have to wait for his call.
2pm
1. Passed by saw C's cutting red bricks - think it is to do the ren floor.
2. Skip is full from the cement floor of the garden - hard but no iron rods.
3. Blue white barrier torn fabric has been removed.
4. Will be removing the notice board too in order to build the fencing.