Rain: - (so far at 5.30pm)
Visit: 1
~9am
1. In car, the men can be seen working on top of the front rc roof putting on the "sar fui".
2. Electricians not here yet. Called them later about not needing the additional metal strip for the pendant light in the wet area and about installing the ceiling fan hook the normal way onto the roof beam.
3. Bguy can be seen passing buckets of "sar fui" up to the person on the front rc roof.
4. Was told that a long ss water pipe with a big diameter is on site.
*Have not posted for 9 days so catching up on the 8 back posts today*
No comments:
Post a Comment