Wdy 58 (d67) Plastering highest roof beam

Rain: *drizzling in the evening*
Visit: 2
~8am
1. More Cworkers - saiyuki, sturdy man, Y, AK with Bguy, bumblebee, itinman.
2. Sealing up the joint between the metal deck and the front wall.
3. Going to plaster the highest roof beam.
4. Surprise drop in while passing by to get ac contact. C not going to P this weekend.


~9.45pm
1. Pass by to see the lightings at night.
2. Back lane is dark.
3. Front lane only 18 is well lighted.