Tracking

Daisypath Anniversary tickers

Friday, June 10, 2011

Wdy 64 (d74) Floor

Rain: Drizzle for about 20minutes ~12.30pm
Visit: 1
11.45am
1. Storeroom and study floor is done.
2. Working on the wet kitchen floor and MBR floor.
3. SS pipe across the courtyard is done.
4. Got the Tat wall fan 175

No comments:

Post a Comment