Projects
Tracking
Friday, June 10, 2011
Wdy 64 (d74) Floor
Rain: Drizzle for about 20minutes ~12.30pm
Visit: 1
11.45am
1. Storeroom and study floor is done.
2. Working on the wet kitchen floor and MBR floor.
3. SS pipe across the courtyard is done.
4. Got the Tat wall fan 175
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment