Wdy 68 (d79) Breakdown gate pillars

Rain: thunder no rain
Visit: 1
7.55am
1. Saw that the gate and iron fence have been removed and locked to the new skip.
2. New skip no 23
3. The brick fence below the iron fence has been removed as well.
4. The gate brick pillar near to 16 is half down.
5. The gate brick pillar near to 18 is just touched a bit.
6. Told C about new design for vent block wall so bumblebee (near 18) and Y (near 16) started putting up the bricks one each side.
7. Sturdym working on the floor of the mini courtyard.
8. Thinman breaking down the gate brick pillar near 16 with the percussion hammer.
9. Bguy working somewhere inside the house.
10. Saiyuki was in to collect some of his things and dropped of bguy and left to go to some other site.
11. W dropped by to collect some things which are small that I could not see what they are when he left on his bike.