Rain: nil
Visit: 2
8.20am-11am
1. Explain brickwork fence design
2. Window guys fix glass and folding door frame
3. 2 painters continue painting work
1.30pm-5.30pm
1. continue brickwork fence - remove plaster line and redo
2. Window guys left at 2.30pm - fixed back and front windows, fixed glass, frames for door and lourve windows courtyard.
3. Plumber wants to move the red flower design downwards.
4. Informed plumber about the filter and he said he will do pvc pipe portion for them to remove it easily without me prompting him to do a pvc section.
5. Asked plumber about the pipe joint which is not ss and he said it is copper because no threading on the cut main pipe so can't use ss joint - I believe it is just a brass joint because it does not look like copper to me (not red enough).
6. Iced tea 1.9 for all 7 - 4 regulars, 1 plumber, 2 painters
7. Kitchen ss sink embedded into the concrete kitchen counter
8. Skip removed and parked on the main side road