Rain: Very heavy rain ~3.30pm to 5pm?
Visit: 1
8.54am
1. They have casted more columns and still casting more columns.
2. A worker can be seen drilling the front brick wall to reveal the existing beam.
3. w gave us the water bill (0-6) and AL letter.
4. The back rc roof has been casted and the wooden frame structure is still there for support.
No comments:
Post a Comment