Rain: Drizzle 2.50pm to 3.15pm
Visit: 2

1. 8.30am
a. The holes for the footing have been filled with water from the rain from yesterday so the workers are scooping out the water with a pail.
b. Filling up the middle hole at the back and digging a new one beside it nearer to 18.
c. stayed under tree

2. 2.05pm
a. As expected the streng never turned up although a call to y asked us to follow up with the streng.
b. No point waiting so concrete is poured into the holes with ready iron frame in them.
c. 19 and 16 talk
d. H arrived at 2.44pm
e. stayed in car

New hole in the middle of the back

Iron frame in with the iron for the stump

Pouring the concrete mix into the hole