Rain: Light rain around 5.30pm to maybe 6.30pm
Visit: 1

We have decided to change our visit schedule to only once per day and only during the morning at 8am since it is much cooler at that time and H is there. So from now on, I will be writing about work done the previous day.

8-9am.
1. Reached there at about 8.05am and saw that a new empty skip is placed outside, alongside the notice board but no workers are at site.
2. Everyone arrived. The hole exposing the clay pipe will be covered since we want windows all the way from the store room till 8 feet.
3. More holes for footing will be dug today.
4. No holes for footing will be dug at the original back wall.
5. First batch of sand, cement, gravel and iron were delivered today.
6. 6 workers onsite, 5y and 1m.
7. Got call at 1145 asking about receipt skip and to arrange for structural engineer visit. Contact direct.

Evidence of termites