Rain: Light rain half day 8.40am to ~3pm
Visit: 1
8.05am
1. C has left so we did not see him.
2. I went to the back of the house and saw a iworker on top of the wooden structure frame for the rc roof.
3. I was told:
a. Only 4 workers onsite today.
b. Ground beam near 18 is done. Ground beams for washroom are being casted.
c. Two water outlet pipes for floor trap near the garden have been laid.
d. Workers still doing the wooden structure frame for back rc roof.
e. The back rc roof will only be casted next Tue said W (not Mon as told by C).