Tracking

Daisypath Anniversary tickers

Saturday, April 2, 2011

Day 5 Back wall and tiles

Rain: very light drizzle around 6am
Visit: 1
1. 5.40pm
T took photos of front and back.
a.From the gate, we looked through the window and saw that the tiles of the toilet and bathroom have been removed.
b. The opening in the window of previous MBR (for aircon) has been nicely boarded up.
c. The whole back wall has been removed with rubble heaped up on the ground.
d. The toilet and bathroom windows, original back door and 3rd room window have been nicely boarded up.
e. The previous skip no. 40 is still there half filled.

I do not think they will work tomorrow as it is a Sunday.

Reading: 34190

No comments:

Post a Comment