Wrkdy 15 (d17) Wooden frame for back rc roof

Rain: med-heavy 8.30pm to 9pm

Visit 2
8am
1. We went there directly as we left home only at 7.40am. H arrived 20mins after we did.
2. H showed us the catalog (photocopied) for the vent block.
3. We confirmed the number of stumps (3) listed on the invoice with H.
4. I noticed:
a. 3 iworkers were removing the wooden frame from the 5 columns at the back ten.
b. Only 2 cworkers onsite.

5.30pm
1. Place were locked up and all workers have left for the day.
2. A wooden frame has been built at the back ten for the back rc roof with many supporting wooden beams (our previous roof truss) below it.