Saturday, April 9, 2011

Wrkdy 11 (d12) Cast ground beam

Rain: 
Light rain  ~5pm to 6pm 


Visit: 2
1. 8am
a. Workers starting to arrive.
b. Got W to explain about the earth in hole. He said the hole is deep (~3feet) and the ground is hard solid so they cast a layer of concrete deep down and filled the hole with earth on top of the cast concrete. For those holes that are not deep, it will be filled with all concrete.
c. Will dig a trench in the existing bathroom for the ground beam for parapet wall and the concrete for the ground beam will fill up the void.
d. H then arrives with the "young man always on hp" and said about the same thing.


2. 5.50pm
a. Pit stop. All trenches and holes in the back ten have been filled with concrete.
b. The front gate is not closed nor locked so I went down to lock it. As I was closing the gate, a voice from underneath the temporary shed said "don't close it, I am waiting for someone to pick me up". It was the "young man always on hp" and I confirmed with him that he will lock it when he leaves.
c. The ground beam in the garden has been casted. 
d. New supply of sand and gravel.
e. Existing skip filled with earth is still there.