No rain
Visit: whole day (9.30am to 4.30pm)
1. Got call from painter asking us to go there at 9 so reach there 9.30am
2. One eman finish up the work, putting up 2 lights front 3 feet, put on two eplugs for back 2 vent fans, connect the shower, change front porch lights to yellow and remove cover.
3. Vin art came to install 2 glass doors for the 2 cubicles.
4. No water coming out from shower so called plumber who came and discover the shower hose is faulty no hole in it.
5. Called C to pick up the scaffolding and he sent W to pick it up about 20? 30? mins from our call
6. Painter clean up the sec doors frame
**** Work on 18 - Man came to do something to the drain so the water from 19 does not flow onto the driveway.
- Painter sweep and varnish the pebblewash