Backdated - post date: Sunday 10 July 2011
No rain
Visit: 1 (8am-10.30am)
1. Pavers for driveway
2. E men putting in switches and etc
3. A men continue laying ducting
4. Drain covered with concrete slabs
5. Install folding door and put in glass for the louvers windows
*** Tinman was tasked to use the e-cutter to cut a line between 18 tiled driveway and 18 concrete driveway in order to do the pebble wash and then break the concrete driveway.