Backdated - post date: Sunday 10 July 2011
No rain
Visit 2 (at ef3oh)
8.30am - 11am
1. One watch marathon, one went look see
2. Folding door top large gap
3. Tinman MIA so only 2 fifties Y and AK
12noon
1. Visit metal works workshop to see gate. No need middle bar.
5pm
1. Concrete front part of driveway done
2. E-meter moved to front wall
3. Pipe work on fencewall near 18 done with gap for wtrfltr
*** No work done on 18 driveway. Only half of the driveway has its top layer of concrete removed