Backdated - post date: Sunday 10 July 2011
No rain
Visit: 2 (at ef3oh)
8am - 1pm
1. Waiting with the taps but soon see that tap work will not be today so left for lunch.
2. was told that tinman quit
3. Pipe work only
4. Glass folding door men came to look at fixing the gap and the bottom part that scratches the floor.
5pm
1. Noticed that the w-meter was moved and the elbow was encased in concrete so we removed the concrete.
*** Don't think any wet work was done on the place as both men were working on the concrete for 18 driveway
No comments:
Post a Comment