Backdated - post date: Sunday 10 July 2011
No rain
Visit: 2 (at ef3oh)
10.30am?
1. Pipe work
2. C's son and sman "clean" the floor - remove everything from the floor of the house, sweep and wash the floor.
5pm?
1. C's son (new red car bka) and sman waiting outside the house for lorry to remove more things.
*** Sman use the percussion hammer to hack the whole of 18 concrete driveway and lorry AC removed the debris
No comments:
Post a Comment