Wrkdy 41 (d47) Metal foil up

Rain: seems likely in the evening, thundering now
Visit: 1
10.30am
1. Went after brunch, lucky to be there at that time when IWK lorry came and the IWK person-in-charged called me to ensure that I am there and asked me to remove the roof lorry parked in the back lane. Saw the desludging in action.
2. The front facing roof has been fully covered with metal deck and they are putting the double sided metal foil up for the front facing roof.
3. Then they started putting up the metal deck for the back portion.
4. Door frame for MBR is in.
5. Putting up the last part of bricks on top of wall divider to 18.
6. Back door way has been cut to bigger size all the way down except for the last brick.
7. Chat to a Mrs L tenant of the row rental costs RM650. Said some bought 260 and do only a little. Said one changed only roof for 20. Said one wanting to sell for 300. Has daughter and son and grandchildren.
8. Y called to tell about courtyard don't over cover with metal deck.

Friday, May 13, 2011

Wrkdy 40 (d46) Roof truss going up

Rain: nil
Visit: 1
7.25am
1. Went for breakfast at 6.30am and were the first ones to reach the site, just in time to see AK and a thin young iman came in.
2. C then came and we chose the colour of satin leather rather then grey
3. The dividing wall of the storeroom and wet kitchen is up with the metal door frame in place.
4. The new door way of the 2nd room has been created by knocking a hole in the wall but the old doorway has not been bricked up yet.
5. The ventilation bricks on top of the existing door way of the new 2nd room have been removed but not bricked up yet.
6. Still putting up the top of the separator wall of 18.
7. Started putting up the bare brick walls of the living room.
8. Called IWK to come and do desludging.
9. Digging toilet pathways.

Thursday, May 12, 2011

Wrkdy 39 (d45) bricks party wall 18

Rain: light long rain ~ 5pm-8pm
Visit: 1
9.50am
1. Supposed to be a quick see shoot but turned to be a long chatty conversation with one of the two roof installers.
2. Saw the plumber come in.
3. Start to lay bricks top party wall 18.
4. Lined the wash area door way with perforated 90 degree line strips.
5. One mroof installer joining up 3 feet to the existing 20 feet mild steel.

Wednesday, May 11, 2011

Wrkdy 38 (d44) roof truss cont' pwall 16

Rain: short concentrated rain ~ 3pm-4pm
Visit: 1
7.40am
1. Reached there early before C but all 3 workers were already there.
2. C asked to choose windows/doors frame colour. Matt black chosen.
3. Work continued laying bricks for party wall 16
4. Roof truss metal 2mm thickness 2inchx4inch box section
4. At around 9.30am two men came to work on the mild steel roof truss
5. 9.40am secman came to give the quote. More discussion.
6. Discuss with C and decided to switch place of wc and shower. Wc next to 18 instead of shower stall.

Tuesday, May 10, 2011

Wrkdy 37 (d43) bricks high up party wall 16

Rain: nil (7 days without a single drop of rain)
Visit: 1
8.10am
1. Did not meet C
2. Bricks for party wall 16 high up.
3. Brick up previous window of wc.
4. Install door frame for store room.
5. Went in to have a look and feel. Wash area felt small. Common area is spacious.
6. Need to change folding doors to open indoor and cover the whole opening framed by concrete pillars.
7. Called secdoor to postpone 16 date delivery because we think it is better to have the roof up before putting in the secdoors.

Monday, May 9, 2011

Wrkdy 36 (d42) remove front rc wood support

Rain: nil
Visit: 1
9am
1. Workers removing rc wood support
2. Confirm the size of the door way for the wash area
3. From the photos, I notice for the brick wall in the wash area (party wall to 18), the cement mortar mix is used in abundance in one area acting as the bricks to fill up a large gap.
4. Did not meet C.

Sunday, May 8, 2011

D41 rest day

Rain: nil
Visit: 1
9am
1. No workers on site - rest day.
2. Took aerial photos from 12 floor.