Rain: nil
Visit: 1
8am
1. Most party wall done until roof beam
2. Informed AK that the cubicles for wc and shower should be just openings with no lintel across the openings
3. Should be doing wash area bricks today
4. 3 aluminium door frames are there (maybe delivered yesterday)
5. Took aerial photo
Saturday, May 7, 2011
Friday, May 6, 2011
Wrkdy 34 (d39) cont brick party wall
Rain: nil
Visit: 1
8am
1. Party wall back ten with 16 has been completed with topping up their party wall too.
2. Window of room 2 facing back ten has been bricked up neatly.
3. Party wall room 2 with 16 has been done until roof beam.
4. Party wall dry kitchen with 18 in progress.
5. Removing wood support from roof beam.
6. The bricks are laid very neatly.
7. Selected off white for metal deck.
8. Informed C that the cubicles for wc and shower should be just openings with no lintel across the openings.
Visit: 1
8am
1. Party wall back ten with 16 has been completed with topping up their party wall too.
2. Window of room 2 facing back ten has been bricked up neatly.
3. Party wall room 2 with 16 has been done until roof beam.
4. Party wall dry kitchen with 18 in progress.
5. Removing wood support from roof beam.
6. The bricks are laid very neatly.
7. Selected off white for metal deck.
8. Informed C that the cubicles for wc and shower should be just openings with no lintel across the openings.
Thursday, May 5, 2011
Wrkdy 33 (d38) start brick party wall
Rain: nil
Visit: 1
8am
1. Bricks at back ten wall done half.
2. The gap between 18 and the back ten side party wall has been filled up with bricks.
3. C came at 814. Sending workers to stayover at the princess pond.
Visit: 1
8am
1. Bricks at back ten wall done half.
2. The gap between 18 and the back ten side party wall has been filled up with bricks.
3. C came at 814. Sending workers to stayover at the princess pond.
Wednesday, May 4, 2011
Wrkdy 32 (d37) start brick laying
Rain: nil
Visit: 1
10.30am
1. New skip no 1 is here
2. Started laying bricks at the back wall
3. Asked to confirm size of back door. They just left 3 feet wide so have to demolish some bricks to make it wider.
4. Decided to up the back window by 6inches
Visit: 1
10.30am
1. New skip no 1 is here
2. Started laying bricks at the back wall
3. Asked to confirm size of back door. They just left 3 feet wide so have to demolish some bricks to make it wider.
4. Decided to up the back window by 6inches
Tuesday, May 3, 2011
Wrkdy 31 (d36) bricks arrived
Rain: Heavy rain ~7am to 9am, ~4.30pm to 8pm
Visit: 0
1. Went C office to receive 3 rolls woven
2. Heard ceremonial cut of overhang roof
3. Arrival of 3 pallets of bricks
Visit: 0
1. Went C office to receive 3 rolls woven
2. Heard ceremonial cut of overhang roof
3. Arrival of 3 pallets of bricks
Monday, May 2, 2011
Wrkdy 30 (d35) remove bits front rc roof wood
International Workers Day
Rain: Heavy rain ~6pm-10pm
Visit: 1
10am
1. Went to meet secguy to give him specs
2. Saw some workers working removing the planks from the edge of the front rc roof.
Rain: Heavy rain ~6pm-10pm
Visit: 1
10am
1. Went to meet secguy to give him specs
2. Saw some workers working removing the planks from the edge of the front rc roof.
Sunday, May 1, 2011