Thursday, June 30, 2011

Wdy 82 (d94) Fans up bar in

Rain: nil
Visit: 2

Did not meet C today

8am - 9am
1. SS middle bar has been done
2. pavers still doing

3.50pm-4.30pm
1. 2 fans are up
2. 16 sepia light balls done
3. gate roller bar in
4. side drain casting
5. house number done - nice
6. cast drain covers

Wednesday, June 29, 2011

Wdy 81 (d93) Pavers

Rain: 9am -11am
Visit: 2

8am
1. Started to rain a little while after we arrived
2. Putting in the letters
3. compacting the sand
4. Painting 18 house
5. A+C people suddenly turned up and started doing snaking ducting
6. Move emeter and do fuse box
7. Plastering up the nail tiny holes (impurities)
8. Do wash feet place.
9. Saw the 1st tank (inspection tank) - all exposed - definitely smell can float up.

12 noon
1. Start putting in the pavers
2. Compacting machine is taken away
3. Started doing drain cover slabs
4. Complete plastering gate column nr 18

Tuesday, June 28, 2011

Wdy 80 (d92) Assortment work

Rain: nil
Visit:2

8-11.30am
1. Waited for C to talk about solving the water seepage.
2. Fixing the 17 18 gap flow
3. Plastering concrete tank, basin in front
4. Doing the raised up for the back kitchen counter.
5. Emen pulling more wires
6. Youngmen helped out a bit
7. 18 wm moved.
8. Lorry collect waste

4-4.30pm
1. AK went up to roof to solve water seepage
2. cap over mail opening

Monday, June 27, 2011

Wdy 79 (d91) Raining can't work

Rain: heavily 3am - 10am (mostly heavy, drizzling for some intervals and then stopped at 10am)
Visit: 1

7.40am
1. Went direct there, observed rain patterns
2. Use nail and hammer to chip away the impurities drawn out by the paint
3. Got the letters, working on it with a ?penknife?
4. 17 18 one gap gushing water into wash basin
5. mystery paver arranger revealed
6. Use slab to cover drain
7. Pmen doing some work

Sunday, June 26, 2011

Wdy 78 (d90) E and P men

Rain: 2-2.30pm. 4-5pm
Visit: 2

11.30am
- try out the glights
- emen doing plastering themselves
- emen doing some wiring work
- saga security services?

5pm
- just a little more pipe gets done
- hole is discovered
- someone arranged the pavers to be vent block - but who?
- corner tour free advice
- secret garden

Saturday, June 25, 2011

Wdy 77 (d89) Parking stopper

Rain: nil
Visit: 2 (Didnot see C today).

1. 8.30am
- Mini courtyard grill done (but missing the middle long bar so got to add it).
- Plastering the top cement bar of the red brick fence nicely.
- Measuring the level of the next 1.x? feet ground.
- Tinman mixing cement


2. 4.55pm
- AK and plumber leaving
- no red flowers/wheels, only 3 blue sticks
- 3 door frames painted black
- Parking bar stopper done
- cement layed for the next 1.x? feet before stopper
- sand readied for pavers
- wiring to gate done
- the slanting big small folding glass door footing rectified
- saw a man cutting off some parts of the mango tree

Friday, June 24, 2011

Wdy 76 (d88) cont' brick fence

Rain: nil
Visit: 1

8am - 9.30am

1. AK continues with brick fence work
2. Bumblebee continues with concrete fish container
3. Y do wet room basin which we brought
4. 2 painters still doing touching up
5. Welectrician brought new helper do wiring with MegaKabel
6. Got lights 4x15 2x35 and replacement lights 2x12
7. Changed glights
8. Got one more eng red tap

Thursday, June 23, 2011

Wdy 75 (d87) brick fence

Rain: nil
Visit: 2

8.20am-11am

1. Explain brickwork fence design
2. Window guys fix glass and folding door frame
3. 2 painters continue painting work

1.30pm-5.30pm

1. continue brickwork fence - remove plaster line and redo
2. Window guys left at 2.30pm - fixed back and front windows, fixed glass, frames for door and lourve windows courtyard.
3. Plumber wants to move the red flower design downwards.
4. Informed plumber about the filter and he said he will do pvc pipe portion for them to remove it easily without me prompting him to do a pvc section.
5. Asked plumber about the pipe joint which is not ss and he said it is copper because no threading on the cut main pipe so can't use ss joint - I believe it is just a brass joint because it does not look like copper to me (not red enough).
6. Iced tea 1.9 for all 7 - 4 regulars, 1 plumber, 2 painters
7. Kitchen ss sink embedded into the concrete kitchen counter
8. Skip removed and parked on the main side road

Wednesday, June 22, 2011

Wdy 74 (d86) shoe cbench

Rain: a few droplets around 3pm
Visit: 2

7.50am-10am
1. Sauna ka
2. C did not visit in this time frame
3. Passed letterings to AK
4. Full skip still there
5. Was told about newspapers andp
6. L talked about expaint
7. From photos can see that:
- Sunflower white looks yellow in sun and very pale yellow in shade
- Sunflower white on outside wall and back wall
- Painting continues
- Wet kit and wet area concrete counter top done
- Doing seat and outside wash basin
- Gate pillars, wmeter and thrash chute done
- New bricks arrived for fence
- Tinman in the morning but not in the afternoon
- All skylights done

3pm-3.50pm
1. Wash mop concrete raised edge done
2. Ask atpis people when is the time to get the bfree installed - they recommend after everything is completed and done so it was decided bym and agreed bytlc that to let plumber all everything in ss then only atpis people come to disconnect necessary parts to connect and put in the atpis.
3. Noticed that the first joint is not ss will have to ask about this tomorrow

Tuesday, June 21, 2011

Wdy 73 (d85) wet kit counter

Rain: nil
Visit: 1
8.15am

1. Left house at 7.30am but due to the horrendous traffic, reached there at 8.15am
2. Was told that:
- W was there to supervise M to do all the concrete built-ins, starting with wet kit counter
- An error was spotted for the wet area counter measurement 22' from wall and the bottom is 22' from tile whereas the bottom should be 22' from wall as well - was rectified
- The gate pillars are up
- The water meter house and the trash chute have also taken form in bricks
- Water meter has been moved and all the black pipes are replaced by ss pipes
- Y started doing bricks for the rest of the fence but was stopped by C because the brick pattern is different and the design is with AK
- Tinman broke 16 gate light while breaking the previous near 16 pillar to be shorter (they should have done this earlier when I confirmed with C that the pillar is supposed to be shorter.
- Was shown a wooden cut outs of the letters which are not according to spec at all so was rejected and the specs will be given again tomorrow.
- Painters are onsite and paint cans are there as well.
- Front wall has been white washed and the e-mains wiring has been put back to that wall
- Wet area floor is fully tiled now.
- The button to press ding dong has been installed on the left gate pillar

Monday, June 20, 2011

Wdy 72 (d84) Gate pillars

Rain: nil
Visit: 1
9.15am - 1030am

1. C is already there when we got there since we informed him this morning we will be there at 9am after getting the taps - 2 pillar @ 112 (rrp 160 - previously quoted 91), 1 bib and 3 bib hose @ 62 (rrp 88 - previously quoted 55).
2. Also got a pop waste 39 and a bottle trap 35
3. Went over the sizes of thrash room, wm area, extra bricks area.
4. Went over design of wet area counter and wet kitchen counter.
5. Show the wash basin and kitchen sink.
6. Point out the paint we have chosen from the catalogue.
7. C will ask W to do all the concrete built-ins.
8. Activities on site:
- Break up the near the drain stones to do the gate pillar
- remove more dirt in the garden to make way for concrete before putting in pavers
- start work on building the gate pillars
- painters sanding the bottom white wash paint to paint the real thing
- eman furiously digging for the pipe conduit that they put in earlier in the ground

Sunday, June 19, 2011

D83 rest day

Rain: droplets
Visit: 1
11.15am - 12.15

1. Both sides fence 16, 18 has been plastered.
2. Steel lintel put up looks so thick 3" x 3"
3. Both sides brick walls back plastered.
4. Bricks marked out the perimeter fencing boxes
5. Side roof tiles put on
6. Workers rest day

Saturday, June 18, 2011

Wdy 71 (d82) fence near 16 plaster

Rain: a few droplets around 1.30pm
Visit: 2

8am-9am
1. C was already onsite
2. Went over design of concrete built-ins
3. Things done:
- wet area nearly fully tiled
- courtyard area floor done with 6 concrete slabs
- all floor traps inside house done
- 3 septic tanks cover done
- mini courtyard roof sides lined with metal sheet
4. Things today:
- side roof tiles brought up to roof
- cement mortar roof middle tiles while droplets of rain fell at 1.30pm
- plaster both side pillars
- break up and remove all existing concrete slab in garden
- drill deeper into fence wall near 16
- plaster near 16 side below white vases fence
- smoothen 18 side fence wall
- grill man came to measure to do lintel for folding door

11am-1.30pm
1. Went over ducting with emen
2. Waited for A to arrive at 12.30pm
3. Went over the process of CCC

Friday, June 17, 2011

Wdy 70 (d81) Red brick ren floor

Rain: nil
Visit: 2
8am
1. The bottom side garden wall near to 18 has been fully plastered.
2. Down pipe has been put on the side near to 18.
3. 2 drainage pipes near 18 have been put into the ground all the way to the drain.
4. Wall tiles in 2 cubicles done half way (no more tiles - not enough)
5. Wc floor seems too low until the ventilation pipe is exposed horizontally but C says it can and will be fixed by making the floor high enough to cover the exposed pipe and then slant towards the outlet pipe - no issue at all.
6. Courtyard floor too low until the outlet pipe joint bend is exposed, pointed out to C who says it is ok can be covered by the concrete floor.
7. Decide on how the pipes leading to the wm is to be done - above ground.
8. To have a barrier or planter box protect the pipe.
9. Drain hole near 18 instead of in the middle.
10. Working on floor of wet kitchen.
11. Saw the ss frames for the 3 septic tanks.
12. A called around 4pm to say ok to meet tomorrow around 2-3pm or earlier - have to wait for his call.

2pm
1. Passed by saw C's cutting red bricks - think it is to do the ren floor.
2. Skip is full from the cement floor of the garden - hard but no iron rods.
3. Blue white barrier torn fabric has been removed.
4. Will be removing the notice board too in order to build the fencing.

Thursday, June 16, 2011

Wdy 69 (d80) Redo the eyes!

Rain: nil
Visit: 1
8am
1. Two sides red brick walls done with one brick near 18 wall orangey in colour so it was taken out and a redder brick put in.
2. The two pipe holes look like eyes according to someone so had to be taken out and just leave a brick gap.
3. All brick gate pillars are gone.
4. Skip 23 replaced with skip 6.
5. Courtyard floor being done.
6. Plumber came with C and was given the specifications of moving the wm.
7. Saw one tiler coming in to do the wet room tiles.
8. Text A to meet up this week onsite but no reply yet.

Wednesday, June 15, 2011

Wdy 68 (d79) Breakdown gate pillars

Rain: thunder no rain
Visit: 1
7.55am
1. Saw that the gate and iron fence have been removed and locked to the new skip.
2. New skip no 23
3. The brick fence below the iron fence has been removed as well.
4. The gate brick pillar near to 16 is half down.
5. The gate brick pillar near to 18 is just touched a bit.
6. Told C about new design for vent block wall so bumblebee (near 18) and Y (near 16) started putting up the bricks one each side.
7. Sturdym working on the floor of the mini courtyard.
8. Thinman breaking down the gate brick pillar near 16 with the percussion hammer.
9. Bguy working somewhere inside the house.
10. Saiyuki was in to collect some of his things and dropped of bguy and left to go to some other site.
11. W dropped by to collect some things which are small that I could not see what they are when he left on his bike.

Tuesday, June 14, 2011

Wdy 67 (d78) Dismantle fence

Rain: drizzle 1015-1100
Visit: 1
8am-1015am
1. Waited until 9.30am for C
2. Some working on the floor
3. Others working on the front 3 feet - lintel issue for front grille (workaround fixed grille on top to be discussed tomorrow).
4. Spotted king kong back rc roof.
5. C asked to take back to office everything that is not needed and to retained a few roof tiles as spare on top of the back rc roof.
6. Called Y to talk about front vent blocks - must go later.

Monday, June 13, 2011

Wdy 66 (d77) Paint work starts

Rain: -
Visit: 1
10.15am
1. Painter with workers putting on skim coat in wet kitchen and also sealant in wet area.
2. Saiyuki working on MBR floor.
3. Y, Ak, Bumblebee, sturdym working on floor for front 3 feet - ground beam.
4. Tinm removing debris from within the house to the skip.
5. Same no.04 skip but with previous content emptied.

Sunday, June 12, 2011

D76 rest day?

Rain: nil
Visit: 0

We just assume that today is a rest day as it is a Sunday.

Saturday, June 11, 2011

Wdy 65 (d75) Floor, walls, bricks

Rain: Heavy rain for ~1.5 hours ~4pm to 5.30pm?
Visit: 1
11.15am
1. Back e-ducting done outside. 19 skip was taken away but ss water tank moved to a temporary place on the roof.
2. Y working on MBR front wall.
3. Sturdym and saiyuki on plastering inner front dining wall.
4. AK working on wet area floor.
5. Bumblebee putting up bricks in courtyard.
6. Bguy cutting previous exposed iron rods in the floor.
7. Tinman mixing cement and sand.
8. Skip 04 is full now with a dead plant in it disposed by some residents on the same street.

Friday, June 10, 2011

Wdy 64 (d74) Floor

Rain: Drizzle for about 20minutes ~12.30pm
Visit: 1
11.45am
1. Storeroom and study floor is done.
2. Working on the wet kitchen floor and MBR floor.
3. SS pipe across the courtyard is done.
4. Got the Tat wall fan 175

Thursday, June 9, 2011

Wdy 63 (d73) "Sar fui" front rc roof

Rain: - (so far at 5.30pm)
Visit: 1
~9am
1. In car, the men can be seen working on top of the front rc roof putting on the "sar fui".
2. Electricians not here yet. Called them later about not needing the additional metal strip for the pendant light in the wet area and about installing the ceiling fan hook the normal way onto the roof beam.
3. Bguy can be seen passing buckets of "sar fui" up to the person on the front rc roof.
4. Was told that a long ss water pipe with a big diameter is on site.

*Have not posted for 9 days so catching up on the 8 back posts today*

Wednesday, June 8, 2011

Wdy 62 (d72) "Sar fui" back rc roof

Rain: Heavy rain around 3.30pm to ?8pm?
Visit: 1

~10.45am
1. Mini sand dune in front of the house. Later was told that this sand is coarse so can not be mixed with the fine sand.
2. All 4 cmen on the back rc roof putting "sar fui" on it.
3. Went in as well.
4. Noticed that the hole for water tank has been created.
5. Had to request one e-connection conduit to be redone.
6. Went to settle the 4th claim at 3pm after which it rained heavily.
7. Decided to just do the normal way of installing the ceiling fan as I was afraid the men would be like tikus baki labu since they do not seem to be in favour of doing it the way I want it to be done.
8. Decided to not add an additional metal to centralise the pendant light in the wet area.

Tuesday, June 7, 2011

Wdy 61 (d71) Plaster back wall acman

Rain: *no rain*
Visit: 1
~10.15am
1. Look through electrical trunking. I went in after a long time.
2. All 4 cmen at the back, busy plastering the back wall.
3. 19 started work on hacking the back rc roof.
4. Consultation with acman at around 11.30am.
5. Bumblebee working alone to brick up the front of the MBR. Asked him to create 2 holes for the copper piping and water piping which he did on the same day (when we checked the next day).
6. Both side of the external side walls have been plastered and a pipe conduit put in around the e-wires to 18.
7. Received 4th claim.

Monday, June 6, 2011

Wdy 60 (d70) Electricity trunking starts

Rain: *no rain*
Visit: 2
~7.45am
1. Sat in car and noticed that the roof has flashing on 18 side. Checked it out and was told all flashings have been laid but is red in colour.
2. Didnot meet C and confirm that ac not coming today. AC called to arrange to meet tomorrow instead.

~2.45pm
1. Met the 2 electricians and walked through the piping and trunking paths.
2. Met ss grilled man and briefed him on the design. Saw the man while cooking in car.

Sunday, June 5, 2011

D69 Rest day (assumed)

Rain: *drizzling early morning, ended by noon)
Visit: 0
1. We assume that there is no work done today.

Saturday, June 4, 2011

Wdy 59 (d68) Plastering MBR conts'

Rain: *nil*
Visit: 1
~9.15am
1. 2/3 roof beams done. One to go.
2. All 4 cmen are lined up in a row on the scafolding working on plastering the MBR wall next to 16.
3. The cross has been plastered.

Friday, June 3, 2011

Wdy 58 (d67) Plastering highest roof beam

Rain: *drizzling in the evening*
Visit: 2
~8am
1. More Cworkers - saiyuki, sturdy man, Y, AK with Bguy, bumblebee, itinman.
2. Sealing up the joint between the metal deck and the front wall.
3. Going to plaster the highest roof beam.
4. Surprise drop in while passing by to get ac contact. C not going to P this weekend.


~9.45pm
1. Pass by to see the lightings at night.
2. Back lane is dark.
3. Front lane only 18 is well lighted.

Thursday, June 2, 2011

Wdy 57 (d66) Plastering conts'

Rain: *no rain*
Visit: 1
~7.30am
1. Was there early. Saw the thin young iman being taken away to join another crew that needs extra hand (the pond in Princess town).
2. Sturdy man still there. Plastering works continue.
3. Waited for C and passed gate design and etc to him.
4. Went to P to get seesee and got lights.

Wednesday, June 1, 2011

Wdy 56 (d65) Plastering roof beams

Rain: *no rain*
Visit: 1
8.15am
1. Didn't meet C
2. Noticed a new face on site - a sturdy Cman getting ready to plaster the roof beams.
3. Going to plaster the MBR wall next to the planned dining area.
4. Back to wait for the A-instant water shower heater.