Tracking

Daisypath Anniversary tickers

Thursday, May 19, 2011

Wdy 45 (d52) Plaster courtyard

Rain: 7-10pm
Visit:2
1. 7.55am
- complete laying bricks on both sides 16 and 18 of the original ventilation blocks by topping up - I think the brick is pressing on the electric wires.
- started to plaster the external walls of the courtyard.
- drilling the surface of the wet cubicles to roughen the surface
- notice the floor trap of the shower cubicle is in the middle and not near the door
- inform need for computer ducting hole from living to mbr
- notice metal foil flapping in the wind and one part is jutting out

2.30pm
-took photos from 12floor
-roof looks good

2. 3pm
- no plumber
- roofer in the house fastening the metal deck to the battens
- plastering external walls of the courtyard
- notice that the plastic covers have been removed from the 18 top party walls
- notice that flashings have been put on the 18 roof side that sticks to our wall

No comments:

Post a Comment