1. Ar10am and water
2. Told aloff 4.30am found cause
3. Spade off 3rd batch smelly cpoo
4. Put cdeter in two places
5. Watch see two blackie fighting
6. Lv11am
Sunday, August 14, 2011
Saturday, August 13, 2011
D138 1 grass crazy
1. Arard11am
2. Hot sun did 11.5 pavers near gate
3. Beewax 2 tables 1 footstepper
4. Early dinner break walk fm 14
5. Thunderstorm emergency light on
6. Another 20 pavers done in rain under porch
7. Bundled up 2nd batch cpoo
8. Near dark 4 pavers near gate done
9. Lv8pm
Next day told ard4.30am alwentoff loose vib
2. Hot sun did 11.5 pavers near gate
3. Beewax 2 tables 1 footstepper
4. Early dinner break walk fm 14
5. Thunderstorm emergency light on
6. Another 20 pavers done in rain under porch
7. Bundled up 2nd batch cpoo
8. Near dark 4 pavers near gate done
9. Lv8pm
Next day told ard4.30am alwentoff loose vib
Friday, August 12, 2011
Thursday, August 11, 2011
Wednesday, August 10, 2011
Tuesday, August 9, 2011
D134 Pye dampshield
1. Add 12 to the 18 pavers of grass making a total of 30
2. Apply pye dampshield to orin cement countertop and wet kitchen countertop
3. Slept at 10.30pm
2. Apply pye dampshield to orin cement countertop and wet kitchen countertop
3. Slept at 10.30pm
Monday, August 8, 2011
Sunday, August 7, 2011
D132 pearl grass
Visit: 1
5pm - 7.30pm
1. Plant a few pavers (10?) with pearl grass (10 sheets 1'x2')
2. one shower
5pm - 7.30pm
1. Plant a few pavers (10?) with pearl grass (10 sheets 1'x2')
2. one shower
Saturday, August 6, 2011
Friday, August 5, 2011
D130 2 tables up
2nd overnight
1. Set up 2 tables (one morning, one night)
2. Set up stand alone sink
3. Emerald curtain folded and c 2 net hanger rack up.
4. 2nd overnight.
1. Set up 2 tables (one morning, one night)
2. Set up stand alone sink
3. Emerald curtain folded and c 2 net hanger rack up.
4. 2nd overnight.
Thursday, August 4, 2011
Wdy 100 (d129) Last work day armed
Drizzling in the afternoon and then raining quite heavily ?4-5.30pm?
7.40am to 1st overnight.
1. 3+1 men to connect up the a-c-system.
2. Break for lunch at 12-1pm
3. Finished at around 3.30pm and tested
4. We went for early dinner at around 4-5pm (raining)
5. 2 Deliveries at 1.15pm, one after the other.
6. 1st overnight.
7.40am to 1st overnight.
1. 3+1 men to connect up the a-c-system.
2. Break for lunch at 12-1pm
3. Finished at around 3.30pm and tested
4. We went for early dinner at around 4-5pm (raining)
5. 2 Deliveries at 1.15pm, one after the other.
6. 1st overnight.
Wednesday, August 3, 2011
Wdy 99 (d128) Last painting
Drizzling 3pm-5pm
Visit: 2
7.4am - 11.15am
1. Touch up painting
2. Front 3 feet painting and 2 septic tank covers
3. Driver went here, blkg, bdrput, here
12.30pm - 4pm
1. Just waiting
Visit: 2
7.4am - 11.15am
1. Touch up painting
2. Front 3 feet painting and 2 septic tank covers
3. Driver went here, blkg, bdrput, here
12.30pm - 4pm
1. Just waiting
Tuesday, August 2, 2011
D127 we working
No rain
Visit: 1
11am-4pm
1. Drill and install curtains wire
2. Clean windows after removal
3. Put up temporary curtains
Visit: 1
11am-4pm
1. Drill and install curtains wire
2. Clean windows after removal
3. Put up temporary curtains
Monday, August 1, 2011
D126 Passing by
No rain
Visit: 1
4.30pm passed by in front and removed mydin leaflet from letter box.
Visit: 1
4.30pm passed by in front and removed mydin leaflet from letter box.
Sunday, July 31, 2011
D125 Halo come visiting
Drizzling ~9am to 10am
Visit:1
~10.30am to 1.45pm
- Rest and relax
- 1 visitor at 1pm
Visit:1
~10.30am to 1.45pm
- Rest and relax
- 1 visitor at 1pm
Saturday, July 30, 2011
Wdy 98 (d124) Wire mesh grill done
Raining heavily 8am - 10am
Visit: 2
1. 8am-2pm
- touch up gate grey and back grill grey
- put in the wire mesh grill (looks good as per design)
2. 9.45pm
- just pass by to view the lighting (took photos)
Visit: 2
1. 8am-2pm
- touch up gate grey and back grill grey
- put in the wire mesh grill (looks good as per design)
2. 9.45pm
- just pass by to view the lighting (took photos)
Friday, July 29, 2011
D123 11 to 8
Raining 5am? - 9am
Visit: 1 (11am to 8pm)
*List is not comprehensive*
1. Sweep floor
2. Mop mbr floor
3. Wipe shower wall tiles
4. Wash hand basin
5. Most importantly to observe the lights through tofu grilled at night
Visit: 1 (11am to 8pm)
*List is not comprehensive*
1. Sweep floor
2. Mop mbr floor
3. Wipe shower wall tiles
4. Wash hand basin
5. Most importantly to observe the lights through tofu grilled at night
Thursday, July 28, 2011
Wdy 97 (d122) Vent block done, ac
No rain
Visit: whole day (7.45am to 5pm)
1. Ac installed 10-12 1850
2. Vent block wall done
3. 3 tebu x 1.8
Visit: whole day (7.45am to 5pm)
1. Ac installed 10-12 1850
2. Vent block wall done
3. 3 tebu x 1.8
Wednesday, July 27, 2011
Wdy 96 (d121) Vent block
Rain: drizzle 2pm-4pm?
Visit: whole day 7.45am - 5.30pm
1. Putting in the vent block wall by W and AK
17 bricks x height 14 bricks (today did till 8 bricks height)
Visit: whole day 7.45am - 5.30pm
1. Putting in the vent block wall by W and AK
17 bricks x height 14 bricks (today did till 8 bricks height)
Tuesday, July 26, 2011
D120 Door stoppers
No rain
Visit: 1
~3.30pm to 4.45pm
1. Stick back npaper to mbdwdw
2. Put a screw on 2 door stoppers with hook (11 each)
3. Remove a little more dfsh
Visit: 1
~3.30pm to 4.45pm
1. Stick back npaper to mbdwdw
2. Put a screw on 2 door stoppers with hook (11 each)
3. Remove a little more dfsh
Subscribe to: