1. Ar10am and water
2. Told aloff 4.30am found cause
3. Spade off 3rd batch smelly cpoo
4. Put cdeter in two places
5. Watch see two blackie fighting
6. Lv11am
Sunday, August 14, 2011
Saturday, August 13, 2011
D138 1 grass crazy
1. Arard11am
2. Hot sun did 11.5 pavers near gate
3. Beewax 2 tables 1 footstepper
4. Early dinner break walk fm 14
5. Thunderstorm emergency light on
6. Another 20 pavers done in rain under porch
7. Bundled up 2nd batch cpoo
8. Near dark 4 pavers near gate done
9. Lv8pm
Next day told ard4.30am alwentoff loose vib
2. Hot sun did 11.5 pavers near gate
3. Beewax 2 tables 1 footstepper
4. Early dinner break walk fm 14
5. Thunderstorm emergency light on
6. Another 20 pavers done in rain under porch
7. Bundled up 2nd batch cpoo
8. Near dark 4 pavers near gate done
9. Lv8pm
Next day told ard4.30am alwentoff loose vib
Friday, August 12, 2011
Thursday, August 11, 2011
Wednesday, August 10, 2011
Tuesday, August 9, 2011
D134 Pye dampshield
1. Add 12 to the 18 pavers of grass making a total of 30
2. Apply pye dampshield to orin cement countertop and wet kitchen countertop
3. Slept at 10.30pm
2. Apply pye dampshield to orin cement countertop and wet kitchen countertop
3. Slept at 10.30pm
Monday, August 8, 2011
Sunday, August 7, 2011
D132 pearl grass
Visit: 1
5pm - 7.30pm
1. Plant a few pavers (10?) with pearl grass (10 sheets 1'x2')
2. one shower
5pm - 7.30pm
1. Plant a few pavers (10?) with pearl grass (10 sheets 1'x2')
2. one shower
Saturday, August 6, 2011
Friday, August 5, 2011
D130 2 tables up
2nd overnight
1. Set up 2 tables (one morning, one night)
2. Set up stand alone sink
3. Emerald curtain folded and c 2 net hanger rack up.
4. 2nd overnight.
1. Set up 2 tables (one morning, one night)
2. Set up stand alone sink
3. Emerald curtain folded and c 2 net hanger rack up.
4. 2nd overnight.
Thursday, August 4, 2011
Wdy 100 (d129) Last work day armed
Drizzling in the afternoon and then raining quite heavily ?4-5.30pm?
7.40am to 1st overnight.
1. 3+1 men to connect up the a-c-system.
2. Break for lunch at 12-1pm
3. Finished at around 3.30pm and tested
4. We went for early dinner at around 4-5pm (raining)
5. 2 Deliveries at 1.15pm, one after the other.
6. 1st overnight.
7.40am to 1st overnight.
1. 3+1 men to connect up the a-c-system.
2. Break for lunch at 12-1pm
3. Finished at around 3.30pm and tested
4. We went for early dinner at around 4-5pm (raining)
5. 2 Deliveries at 1.15pm, one after the other.
6. 1st overnight.
Wednesday, August 3, 2011
Wdy 99 (d128) Last painting
Drizzling 3pm-5pm
Visit: 2
7.4am - 11.15am
1. Touch up painting
2. Front 3 feet painting and 2 septic tank covers
3. Driver went here, blkg, bdrput, here
12.30pm - 4pm
1. Just waiting
Visit: 2
7.4am - 11.15am
1. Touch up painting
2. Front 3 feet painting and 2 septic tank covers
3. Driver went here, blkg, bdrput, here
12.30pm - 4pm
1. Just waiting
Tuesday, August 2, 2011
D127 we working
No rain
Visit: 1
11am-4pm
1. Drill and install curtains wire
2. Clean windows after removal
3. Put up temporary curtains
Visit: 1
11am-4pm
1. Drill and install curtains wire
2. Clean windows after removal
3. Put up temporary curtains
Monday, August 1, 2011
D126 Passing by
No rain
Visit: 1
4.30pm passed by in front and removed mydin leaflet from letter box.
Visit: 1
4.30pm passed by in front and removed mydin leaflet from letter box.