Tracking

Daisypath Anniversary tickers

Thursday, March 31, 2011

Day 3 Clear rubble

No rain

Visited twice:
1. 0820 to 1030
a. H took measurement
b. with a coffee shop session to discuss columns, beams 16inches and roof
c. iced coffee, coffee and hot barli kosong 4.10

2. 1738 to 1742
a. ensure the water supply has been turned off
b. take note of work done - the floor has been cleared of rubble

Skip leaving site at 8am after sokoban

Wood that was infested by termites

Morning reading: 3268x

Evening reading: 33148

Wednesday, March 30, 2011

Skip number

Day 2 early rain

I woke up in the dark, hearing the rain outside. I guess the time to be around 4am? The rain only stopped at around 7.15am. Will the site be all wet and is flooded? I can only wonder.

We did not go to the site in the morning. We only went there at around 4.55pm and saw the workers (4c - 3 workers, 1 is the supervisor - he seemed fresh) preparing to leave. We waited until all of them left before taking photos of the site.

All the roof tiles and roof beams (the entire roof) have been removed. There is a lot of rubble in the last back ten. While taking the photos, I noticed that the skip in front is bigger so they have removed the first skip. Looking at the walls revealed, there is only 1 layer of brick wall between two houses. I wonder should we build our own walls.

Water is flowing in the drain like waterfall. We turned off the water mains but yet the water is still flowing. I can only wonder how much our water bill will be for this month.

Tuesday, March 29, 2011

Day 1 Half roof taken down

Visited site at around 3pm, half the roof has been taken down.

No rain for the whole day. The morning is cool and the afternoon hot and sunny.

Friday, March 25, 2011